Tanzania has secured a landmark $1.2 billion commercial financing facility to build a critical 411-kilometer stretch of its standard-gauge railway (SGR), backed by the largest partial credit guarantee in the history of the African Development Bank (AfDB).
Announced by the African Development Bank in early November, the financing agreement covers the Tabora-Kigoma section of the railway, known as Lot 6. Acting as the initial mandated lead arranger, the AfDB structured the deal around an $800 million partial credit guarantee covering the principal of the guaranteed tranche and two years of interest.
The financing structure enabled Tanzania to access international commercial capital despite global interest rate pressures and existing sovereign debt considerations.
The $1.2 billion commercial facility is the cornerstone of a broader $2.3 billion financing package for the project, which will also include an export credit agency tranche and an additional tranche arranged with a co-guarantor.
Beyond its domestic benefits, the railway is designed to transform cross-border trade along the Central Corridor by improving access to the Indian Ocean through the port of Dar es Salaam for four neighboring countries: the Democratic Republic of Congo (DRC), Burundi, Rwanda and Uganda. The network will facilitate regional connectivity through a combination of cross-border rail extensions and lake transport links.
Running to Kigoma on the eastern shore of Lake Tanganyika, the railway will connect cargo by ferry to the Congolese port of Kalemie, with longer-term plans to extend rail tracks into eastern DRC via Bujumbura and Uvira toward Kindu.
A dedicated cross-border spur branching off at Uvinza will connect directly to Burundi, linking the nickel-rich region of Musongati and the capital, Gitega, to global shipping routes.
Farther north, a planned branch from Isaka in northwestern Tanzania will extend to Rwanda’s capital, Kigali, while the northern terminus of Tanzania’s SGR at Mwanza on Lake Victoria will provide connections via lake ferries to Port Bell and Jinja in Uganda.
To raise the commercial funds, the AfDB assembled a nine-bank syndicate co-arranged by Deutsche Bank and Société Générale, with participating lenders HSBC, Commerzbank, Nedbank, Stanbic Bank Tanzania, First Abu Dhabi Bank, FirstBank UK and Bank of Africa United Kingdom.
The syndicate committed $720 million in guaranteed lending and $480 million based on sovereign credit risk without the AfDB guarantee. To further reduce the transaction’s risk and expand private-sector participation, insurance broker Texel arranged credit insurance that distributes $405.5 million of the AfDB’s exposure among a group of international insurers, including Lloyd’s syndicates.
“By combining development finance, commercial lending and insurance capacity, we have successfully unlocked the scale of financing required to deliver this type of transformational regional infrastructure,” said Max Ndiaye, senior director at the African Development Bank Group.
He noted that the deal reflects the bank’s New African Financial Architecture for Development (NAFAD), which prioritizes risk-sharing partnerships to mobilize private capital at scale.
The electrified Tabora-Kigoma line is a vital link in Tanzania’s broader railway network and forms part of a $3.2 billion mandate given to the AfDB to mobilize funding for the country’s regional rail ambitions.
Once operational, Lot 6 will provide a high-capacity, long-haul transport corridor connecting Tanzania’s western regions to the port of Dar es Salaam. The project is expected to lower freight costs, create construction and operational jobs, and generate economic opportunities for local farmers and mining operators.
“The strategic value of this railway lies in the productive investment it can unlock along the Central Corridor,” said Mike Salawou, director of the AfDB’s Infrastructure and Urban Development Department.
“By connecting agricultural and mineral production areas, industrial centers and markets, the investment can strengthen regional value chains and expand opportunities for businesses and communities.”
Managed by the Tanzania Railways Corporation (TRC), the electrified SGR is one of East Africa’s most ambitious infrastructure projects. It is designed to replace Tanzania’s century-old, colonial-era meter-gauge rail network with faster, higher-capacity freight and passenger lines.
Passenger services are already operating on the eastern sections linking Dar es Salaam to the administrative capital, Dodoma, while construction progresses on northern branches toward Lake Victoria.
For the western Tabora-Kigoma section, which spans roughly 506 kilometers including passing loops and sidings, Tanzania previously awarded the design-and-build contract to a Chinese consortium comprising China Civil Engineering Construction Corporation (CCECC) and China Railway Construction Corporation (CRCC).
The closing of the $1.2 billion financing facility clears a major funding hurdle for the western expansion and advances the AfDB’s Ten-Year Strategy (2024-2033), demonstrating how multilateral credit guarantees can unlock commercial capital for large-scale African infrastructure projects amid tight global credit conditions.
























